Production & Delivery Lead Time

Our lead times vary from time to time. This is because all of our products are hand-built to order and production times can sometimes fluctuate. Please keep an eye on the red banner at the top of our website, which will give you an indication of current lead times.

Current Lead Time: 3 weeks

Window Pods® 2.0 Installation

vanshades window pod install

Your Window Pods® are supplied pre-assembled and ready for you to install. There is no need to alter the product if you have ordered correctly.

Chair Pod® 2.0 Installation Guide

You can download our Chair Pod 2.0® Installation Guide here: Fitting requirements To fit the Chair Pod®, you MUST have a minimum of 80mm clearance

Barn Door and Tailgate Bonding

As well as the bigger jobs on your camper, it’s also just as important to get the finer details nailed on the head too. Thankfully,

Why choose the Window Pod®?

Since the 60s, holidaymakers and camping fanatics have been decorating their camper vans to suit their own individual styles and tastes. In the years that